Every imported question, contribution and motion, with its classification. Unflagged, uncertain and not-yet-analysed records are all included so the analysis can be checked independently.
To ask the Minister for the Economy to detail how the Careers Action Plan 2025–2028 will ensure that, each young person identified as being at risk of becoming not in education, employment or training, has a named point of contact and a completed handover into (i) education; (ii) training; (iii) employment; and (iv)…
To ask the Minister for the Economy whether she will introduce formal regulatory oversight of the home heating oil market, to provide greater transparency on pricing and stronger protections for consumers.
To ask the Minister for the Economy to detail whether she has any plans to introduce legislation in Northern Ireland to permit the use of plug-in solar panels, following the introduction of legislation by the UK Government.
To ask the Minister for Infrastructure to detail (i) the number of press officers employed in her Department; and (ii) the cost of employing those press officers since September 2025.
To ask the Minister for Infrastructure to detail any data that her Department holds on the difference between the number of journeys made by disabled and non-disabled people in Northern Ireland.
To ask the Minister for Infrastructure to detail any steps her Department has taken to reduce congestion on the B23 at the Ballyaughlis crossroads, during rush hour.
To ask the Minister for Infrastructure to detail (i) any identified cause of the sewerage blockage and overflow in the Derrybeg area, Newry, on Monday 14 September 2026; (ii) any action that has been taken to rectify this issue; and (iii) any measures that are being undertaken to implement long-term solutions, to…
To ask the Minister for Infrastructure whether a risk assessment has been undertaken into the public health impacts of the sewerage blockage and overflow in Derrybeg area, Newry, on Monday 14 September 2026, including any outcomes.
To ask the Minister for Infrastructure to detail any measures being taken by her Department to prepare and strengthen the (i) roads; and (ii) rail networks, in advance of the strongest El Niño on record, which is expected to bring intense rain and storm conditions throughout autumn and winter.
To ask the Minister for Infrastructure for an update on any action being taken by her Department to alleviate flooding in Campsie and Lower Market Street, Omagh.
To ask the Minister for Infrastructure to detail the contractual arrangements for the provision of temporary traffic management, to include regions covered by each contract.
To ask the Minister for Infrastructure to detail the amount her Department has spent on temporary traffic management traffic light provision, in each of the last three years.
To ask the Minister for Infrastructure to detail (i) all (a) maintenance; and (b) repair works, undertaken at Kilrea Bridge, in the ten years prior to its closure in September 2025; (ii) the cost of each scheme; and (iii) any structural concerns identified during inspections over that period.
To ask the Minister for Infrastructure to detail the final cost of the repair works undertaken at Kilrea Bridge, following its closure in September 2025, including expenditure on (i) site (a) investigations; and (b) design; (ii) temporary stabilisation works; (iii) permanent structural repairs; (iv) traffic…
To ask the Minister for Infrastructure for an update on any work undertaken by her Department to assess the feasibility of replacing Kilrea Bridge, including any (i) consideration of potential options; (ii) estimated costs; and (iii) timescales.
To ask the Minister for Infrastructure to detail (i) any assessment that has been made of the remaining service life of the Kilrea Bridge, following completion of the recent repair works; (ii) any further works identified as necessary; (iii) the anticipated cost of these works; and (iv) the inspection and monitoring…
To ask the Minister for Infrastructure to detail any (i) assessment her Department has undertaken of the impact of the closure of the Kilrea Bridge, between September 2025 and February 2026, on (a) traffic volumes on diversionary routes; (b) journey times; (c) public transport services; and (d) local businesses and…
To ask the Minister for Infrastructure to detail the amount her Department has spent on social media (i) influencers; and (ii) content creators, since February 2024.
To ask the Minister for Infrastructure to detail any mechanisms that her Department uses to ensure that the cumulative transport requirements, arising from multiple adjacent residential developments, are assessed collectively, rather than solely through individual developer transport assessments.
To ask the Minister for Infrastructure whether (i) DfI Roads has assessed the continuing technical feasibility of the Saintfield Road, Belfast, access, approved under Planning Appeal 2019/A0178, and (ii) subsequent alterations to the surrounding road network have affected the ability to implement that approved access.
To ask the Minister for Infrastructure to detail any modelling that has been undertaken of the future capacity and operation of the Primrose Hill junction, Belfast, following completion of planned road connections and committed residential development in the surrounding area.
To ask the Minister for Infrastructure whether (i) her Department has conducted any survey on traffic progression, since the removal of the left turn slip road from Whinney Hill onto the Ballymiscaw Road; (ii) her officials have raised any concerns regarding the increase of traffic build up on the Ballymiscaw Road,…
To ask the Minister for Infrastructure to detail (i) any changes included in Translink’s current Equality Impact Assessment consultation that can be implemented without approval from her Department; (ii) any changes that require departmental or Ministerial approval; and (iii) whether the (a) final Equality Impact…
To ask the Minister for Infrastructure to detail any Translink bus and rail services, operating within or through South Antrim, that are included in the current Equality Impact Assessment consultation, broken down by (i) route or service; (ii) current patronage; (iii) proposed change; (iv) projected annual saving; and…