Debate contribution: Water, Sustainable Drainage and Flood Management Bill: Consideration Stage

Debate contribution by Mr Justin McNulty on .

MLA
Mr Justin McNulty
Party at the time
Social Democratic and Labour Party
Date
12 October 2026
Type
Debate contribution
Business
Executive Committee Business
Heading
Water, Sustainable Drainage and Flood Management Bill: Consideration Stage
Assembly identifier
Official Report component 5785905

Text

As members of the Infrastructure Committee, we support all the amendments that have been proposed and see them as providing important tidying up and clarification of the Water, Sustainable Drainage and Flood Management Bill. In my role as an MLA and as a civil engineer, I have spoken with industry, which has expressed a strong appetite for guidance on sustainable urban drainage systems that are not just hard SuDS. The current guidelines in the North provide only for limiting the storm water run-off from any site to 10 litres per second per hectare and to accommodate storage, generally on-site, in underground tanks or oversized pipes. Provisions have been made with regard to soft SuDS and offsetting. However, those have been agreed and determined only on a very local, ad hoc and individual basis. Developers are crying out for guidance and criteria that they can design to for approval in relation to construction of soft SuDS solutions like swales and ponds. The expectation is that the Bill will provide clarity on design guidance and for responsibility and maintenance of such. The SuDS Bill is long overdue to help to alleviate flooding and provide associated flood remediation, define and regulate SuDS design and construction, regulate water use and make provisions regarding communication with sewers. As laid out in the July 2026 Turley report, waste water has become a major growth constraint for construction. It is estimated that around 55,000 homes are delayed or impeded due to some level of capacity constraints: no drains, no cranes. The Turley report states that the SuDS Bill will reduce future pressure on the waste water system but not as a near-term solution to the current capacity crisis. Therefore, while the Bill is a positive step forward, the Department must collaborate with industry to find long-lasting solutions to address the waste water capacity crisis that is a barrier to construction and economic development to the tune of £11 billion in an economic opportunity gap by 2040. I will say that again: the current lack of capacity in our waste water system and the lack of a plan to address that inadequate capacity will cost our economy £11 billion by 2040.

363 words. Text as published by the Northern Ireland Assembly.

Assessment

Awaiting analysis

This record has not been analysed yet. It is not counted in any total until it has been assessed.

Disagree with this assessment?

Classifications can be challenged. A person reviews every challenge, and any change is recorded publicly above with its reason.

Challenge this classification